河南百川畅银实业有限公司

L
Luohe Jianxi
Jiyuan
Jiaozuo
Xinxiang
Shangqiu
Anyang
Hebi
Luohe
Pingdingshan
Nanyang
Xinyang
Zhumadian
Huixian
Shenqiu
Xiangcheng
Zhenping
Ruzhou
Puyang
Tanghe
Dengzhou
Shangcai
xichuan

Luoyang BCCY

The landfill gas power generation project of Luoyang Panlongzhong domestic waste landfill sites, with installed capacity of four 500KW units, was successfully connected to the grid for power generation in January 2009. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on June 11, 2008 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on July 28, 2009, the project crediting period is 10 years.

+ Details
Close

Luoyang Jianxi BCCY

The landfill gas power generation project of Luoyang Zhangluoping domestic waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in January 2011. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on February 15, 2011 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on August 24, 2012, the project crediting period is 10 years.

+ Details
Close

Jiyuan BCCY

The landfill gas power generation project of Jiyuan municipal waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in March 2010. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on July 13, 2010 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on April 12, 2012, the project crediting period is 10 years.

+ Details
Close

Jiaozuo BCCY

The landfill gas power generation project of Jiaozuo Zhouliu domestic waste landfill sites, with installed capacity of three 500KW generator units, was successfully connected to the grid for power generation in March 2011. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on November 30, 2011 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on February 8, 2012, the project crediting period is 10 years.

+ Details
Close

Xinxiang BCCY

The landfill gas power generation project of Xinxiang municipal waste landfill sites, with installed capacity of four 500KW units, was successfully connected to the grid for power generation in February 2013.

+ Details
Close

Shangqiu BCCY

The landfill gas power generation project of Shangqiu municipal waste landfill sites, with installed capacity of four 500KW generator units, was successfully connected to the grid for power generation in December 2012. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on March 28, 2012 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on July 30, 2012, the project crediting period is 10 years.

+ Details
Close

Anyang BCCY

The landfill gas power generation project of Anyang Tanggou domestic waste landfill sites, with installed capacity of four 500KW generator units, was successfully connected to the grid for power generation in May 2011. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on November 25, 2011 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on February 8, 2012, the project crediting period is 10 years.

+ Details
Close

Hebi BCCY

The landfill gas power generation project of Hebi municipal domestic waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in May 2013.

+ Details
Close

Luohe BCCY

The landfill gas power generation project of Luohe municipal waste landfill sites was connected to power grid successfully for power generation in June 2010. Since then, it has been able to transport about 20 million kilowatt hours of "green power" to state grid every year to address the household power utilization of about 100 thousand residents, relieving the stress in local power supply. The project obtained the clean development mechanism project approval issued by National Development and Reform Commission on July 13, 2010 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on October 7, 2011, the project crediting period is 10 years. In recent years, the state has vigorously promoted and supported green power projects, the waste landfill gas power generation can make rational use of landfill gas resources to effectively reduce the greenhouse effects of landfill gas on atmosphere and the pollution of ambient environment caused by waste landfill, thus to promote the energy conservation and emission reduction.

+ Details
Close

Pingdingshan BCCY

The landfill gas power generation project of Pingdingshan municipal waste landfill sites, with installed capacity of three 500KW generator units, was successfully connected to the grid for power generation in September 2013.

+ Details
Close

Nanyang BCCY

The landfill gas power generation project of Nanyang municipal waste landfill sites, with installed capacity of three 500KW generator units, was successfully connected to the grid for power generation in January 2009. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on June 11, 2008 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on January 20, 2011, the project crediting period is 10 years.

+ Details
Close

Xinyang BCCY

The landfill gas power generation project of Xinyang municipal waste landfill sites, with installed capacity of three 500KW generator units, was successfully connected to the grid for power generation in December 2010. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on February 15, 2011 and was registered successfully as voluntary emission reductionon project under the gold standard on January 3, 2013, the project crediting period is 10 years.

+ Details
Close

Zhumadian BCCY

The landfill gas power generation project of Zhumadian municipal waste landfill sites, with installed capacity of two 1000KW generator units, was successfully connected to the grid for power generation in January 2014.

+ Details
Close

Huixian BCCY

The landfill gas power generation project of Huixian waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in January 2011.

+ Details
Close

Shenqiu BCCY

The landfill gas power generation project of Shenqiu waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in December 2014.

+ Details
Close

Xiangcheng BCCY

The landfill gas power generation project of Xiangcheng waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in November 2011.

+ Details
Close

Zhenping BCCY

The landfill gas project of Zhenping waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in March 2015.

+ Details
Close

Ruzhou BCCY

The landfill gas project of Ruzhou waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in March 2015.

+ Details
Close

Puyang BCCY

Puyang landfill gas power generation projects signed in March 2016, in January 2017 formally connected to the grid, the installed capacity of 2000 kw.

+ Details
close

Tanghe BCCY

The waste landfill gas power project in tanghe city, henan province was successfully connected to the grid in December 2017.

+ Details
close

Dengzhou BCCY

The landfill gas generation project in dengzhou city, henan province, signed in July 2017, is currently under construction and plans to be connected in the first half of 2018.

+ Details
close

Shangcai BCCY

Henan zhumadian shangcai landfill gas generation project, signed in November 2017, planned to connect the grid in July 2018.

+ Details
close
BengBu
SuZhou
FeiXi
NingGuo
MaAnShan
GuangDe
Mengcheng

Bengbu BCCY

The landfill gas power generation project of Bengbu municipal waste landfill sites, with installed capacity of two 1000KW units, was connected to power grid successfully for power generation in January 2014. The implementation of this project improves the living environment of local residents and eliminates the potential safety hazards of waste landfill sites, and it is an effective mainstream approach internationally for domestic waste treatment and utilization at present.

+ Details
Close

Suzhou YouNeng

Suzhou waste landfill gas power generation project was completely acquired from British Sindicatum company in May 2014 and its installed capacity is 2000KW.

+ Details
Close

Feixi BCCY

The landfill gas project of Feixi waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in March 2015.

+ Details
Close

Ningguo BCCY

The landfill gas project of Ningguo waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in April 2015.

+ Details
Close

Maanshan BCCY

The landfill gas project of Maanshan waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in July 2015.

+ Details
Close

GuangDe BCCY

Anhui GuangDe landfill landfill gas power generation project installed capacity of 1000 kw, has successfully connected to the grid in 2016.

+ Details
close

Mengcheng BCCY

In the city of mengcheng, anhui province, the landfill gas power generation project, signed in November 2017, is currently under construction and is scheduled to be connected in July 2018

+ Details
close

Leshan BCCY

The landfill gas power generation project of Leshan waste landfill sites, with installed capacity of four 500KW generator units, was successfully connected to the grid for power generation in December 2014.

+ Details
Close

Luoyang BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Luoyang Panlongzhong domestic waste landfill sites, with installed capacity of four 500KW units, was successfully connected to the grid for power generation in January 2009. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on June 11, 2008 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on July 28, 2009, the project crediting period is 10 years.
Luoyang Jianxi BCCY
The landfill gas power generation project of Luoyang Zhangluoping domestic waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in January 2011. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on February 15, 2011 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on August 24, 2012, the project crediting period is 10 years.

Jiyuan BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Jiyuan municipal waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in March 2010. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on July 13, 2010 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on April 12, 2012, the project crediting period is 10 years.

Jiaozuo BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Jiaozuo Zhouliu domestic waste landfill sites, with installed capacity of three 500KW generator units, was successfully connected to the grid for power generation in March 2011. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on November 30, 2011 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on February 8, 2012, the project crediting period is 10 years.

Xinxiang BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Xinxiang municipal waste landfill sites, with installed capacity of four 500KW units, was successfully connected to the grid for power generation in February 2013.

Shangqiu BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Shangqiu municipal waste landfill sites, with installed capacity of four 500KW generator units, was successfully connected to the grid for power generation in December 2012. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on March 28, 2012 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on July 30, 2012, the project crediting period is 10 years.

Anyang BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Anyang Tanggou domestic waste landfill sites, with installed capacity of four 500KW generator units, was successfully connected to the grid for power generation in May 2011. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on November 25, 2011 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on February 8, 2012, the project crediting period is 10 years.

Hebi BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Hebi municipal domestic waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in May 2013.

Bengbu BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Bengbu municipal waste landfill sites, with installed capacity of two 1000KW units, was connected to power grid successfully for power generation in January 2014. The implementation of this project improves the living environment of local residents and eliminates the potential safety hazards of waste landfill sites, and it is an effective mainstream approach internationally for domestic waste treatment and utilization at present.

Tianshui BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Tianshui municipal waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in January 2014.

Luohe BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Luohe municipal waste landfill sites was connected to power grid successfully for power generation in June 2010. Since then, it has been able to transport about 20 million kilowatt hours of "green power" to state grid every year to address the household power utilization of about 100 thousand residents, relieving the stress in local power supply. The project obtained the clean development mechanism project approval issued by National Development and Reform Commission on July 13, 2010 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on October 7, 2011, the project crediting period is 10 years. In recent years, the state has vigorously promoted and supported green power projects, the waste landfill gas power generation can make rational use of landfill gas resources to effectively reduce the greenhouse effects of landfill gas on atmosphere and the pollution of ambient environment caused by waste landfill, thus to promote the energy conservation and emission reduction.
CDM Projects
The landfill gas power generation project of Luohe municipal waste landfill sites was connected to power grid successfully for power generation in June 2010. Since then, it has been able to transport about 20 million kilowatt hours of "green power" to state grid every year to address the household power utilization of about 100 thousand residents, relieving the stress in local power supply. The project obtained the clean development mechanism project approval issued by National Development and Reform Commission on July 13, 2010 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on October 7, 2011, the project crediting period is 10 years. In recent years, the state has vigorously promoted and supported green power projects, the waste landfill gas power generation can make rational use of landfill gas resources to effectively reduce the greenhouse effects of landfill gas on atmosphere and the pollution of ambient environment caused by waste landfill, thus to promote the energy conservation and emission reduction.

Pingdingshan BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Pingdingshan municipal waste landfill sites, with installed capacity of three 500KW generator units, was successfully connected to the grid for power generation in September 2013.

Nanyang BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Nanyang municipal waste landfill sites, with installed capacity of three 500KW generator units, was successfully connected to the grid for power generation in January 2009. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on June 11, 2008 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on January 20, 2011, the project crediting period is 10 years.

Xinyang BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Xinyang municipal waste landfill sites, with installed capacity of three 500KW generator units, was successfully connected to the grid for power generation in December 2010. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on February 15, 2011 and was registered successfully as voluntary emission reductionon project under the gold standard on January 3, 2013, the project crediting period is 10 years.

Yichang BCCY

Landfill Gas Power Generation Projects
The marsh gas power generation project of Yichang Huangjiawan waste landfill sites, with 1500KW total installed capacity, was connected to the grid for power generation in May 2012. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on March 28, 2012 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on July 30, 2012, the project crediting period is 10 years.

Ezhou BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Ezhou municipal domestic waste landfill sites, with 1000KW total installed capacity, was connected to the grid for power generation in May 2013. This project obtained the clean development mechanism project approval issued by National Development and Reform Commission on March 28, 2012 and was registered successfully under the United Nations Framework Convention on Climate Change (UNFCCC) on July 30, 2012, the project crediting period is 10 years.

ShangRao BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Shangrao municipal waste landfill sites, with installed capacity of four 500KW generator units, was successfully connected to the grid for power generation in August 2013.

Zhumadian BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Zhumadian municipal waste landfill sites, with installed capacity of two 1000KW generator units, was successfully connected to the grid for power generation in January 2014.

Chaozhou BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Chaozhou municipal waste landfill sites was connected to power grid successfully for power generation in December 2013. Since then, this project has been able to transport about 20 million kilowatt hours of "green power" to southern power grid every year to address the household power utilization of about 100 thousand residents, playing a part in relieving the stress in power supply of Chaozhou power grid during peak hours. The implementation of this project solves the greenhouse effects and environmental pollution caused by waste landfill gas emission into sky, eliminates the potential safety hazards of waste landfill sites and turns the waste into resource for energy conservation and emission reduction, it conforms to national industrial policies and produces better economic benefits and good social benefits as well, and it is an effective mainstream approach internationally for domestic waste treatment and utilization at present.

Nanjing Xinneng

Landfill Gas Power Generation Projects
The landfill gas power generation project of Nanjing Tianjingwa landfill sites was completely acquired from Shenzhen Xinneng Environmental Protection Technology Co., Ltd. in September 2014 and its installed capacity is 2700KW unit. The implementation of this project not only solves the greenhouse effects and environmental pollution caused by waste landfill gas emission into sky, improves the living environment of local residents, but also eliminates the potential safety hazards of waste landfill sites, and turns the waste into resource for energy conservation and emission reduction, it conforms to national industrial policies and produces better economic benefits and good social benefits as well, and it is an effective mainstream approach internationally for domestic waste treatment and utilization at present.

Baoding Xinneng

Landfill Gas Power Generation Projects
Baoding waste landfill gas power generation project was completely acquired from Shenzhen Xinneng Environmental Protection Technology Co., Ltd. in September 2014 and its installed capacity is 2000KW.

Liuzhou Xinneng

Landfill Gas Power Generation Projects
The Liuzhou municipal waste landfill gas power generation project was completely acquired from Shenzhen Xinneng Environmental Protection Technology Co., Ltd. in September 2014 and its installed capacity is 4000KW. The implementation of this project not only solves the greenhouse effects and environmental pollution caused by waste landfill gas emission into sky, improves the living environment of local residents, but also eliminates the potential safety hazards of waste landfill sites, and turns the waste into resource for energy conservation and emission reduction, it conforms to national industrial policies and produces better economic benefits and good social benefits as well, and it is an effective mainstream approach internationally for domestic waste treatment and utilization at present.

Guilin Xinneng

Landfill Gas Power Generation Projects
The Guilin waste landfill gas power generation project was completely acquired from Shenzhen Xinneng Environmental Protection Technology Co., Ltd. in September 2014 and its installed capacity is 2000KW. The implementation of this project not only solves the greenhouse effects and environmental pollution caused by waste landfill gas emission into sky, improves the living environment of local residents, but also eliminates the potential safety hazards of waste landfill sites, and turns the waste into resource for energy conservation and emission reduction, it conforms to national industrial policies and produces better economic benefits and good social benefits as well, and it is an effective mainstream approach internationally for domestic waste treatment and utilization at present.

Handan Xinneng

Landfill Gas Power Generation Projects
Handan waste landfill gas power generation project was completely acquired from Shenzhen Xinneng Environmental Protection Technology Co., Ltd. in September 2014 and its installed capacity is 2000KW.

Weinan BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Weinan waste landfill sites, with installed capacity of two 500KW generator units,is expected to be connected to the grid for power generation in December 2014.

Leshan BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Leshan waste landfill sites, with installed capacity of four 500KW generator units, was successfully connected to the grid for power generation in December 2014.

Yulin BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Xining domestic waste landfill sites, with installed capacity of four 500KW generator units, was successfully connected to the grid for power generation in December 2014.

Xining BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Xining domestic waste landfill sites, with installed capacity of four 500KW generator units, was successfully connected to the grid for power generation in December 2014.

Wuwei BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Wuwei domestic waste landfill sites, with installed capacity of four 500KW generator units, was successfully connected to the grid for power generation in December 2014.

Shanghai Minxin

Landfill Gas Power Generation Projects
As for the heat and power cogeneration project of Shanghai Laogang Industrial Area, according to the Suggestions on the Implementation of Further Improvement of Clean Energy Alternative Work of Fuel Coal (Mazout) Boilers and Furnaces issued by six departments including Municipal Development and Reform Commission and forwarded by Shanghai Municipal Government, the Bureau of Industry invited Tongji University and Shanghai Chengtou, etc. to discuss the central heating plan, and the main energy using enterprises in the area were also consulted to finally form the plan of Distributed Natural Gas Supply and Supplementary Marsh Gas Burning. This plan was based on the gradient utilization of natural gas and the supplementation of marsh gas from the fifth phase landfill gas in Laogang, it not only provides economical steam and electricity to the enterprises in the area, but also sufficiently controls the wafting of landfill gas smells, setting a new model of coordinated development of environmental protection and local economy. Laogang Industrial Area invited Shanghai BCCY New Power Industrial Co., Ltd. to cooperate in the implementation of Distributed Energy Area Function Project of Laogang Industrial Area. The above said project aims at achieving resource utilization, environmental protection, energy conservation and emission reduction through its investment, construction, operation and management, and it is expected to be completed and put into operation in October 2015.

Linyi BCCY

Landfill Gas Power Generation Projects
The landfill gas project of Linyi landfill sites was completely acquired from Shenzhen Xinneng Environmental Protection Technology Co., Ltd. in September 2014 and its installed capacity is 2000KW, it was connected to the grid for power generation in December 2014.

Beijing Xinxin-Tomorrow

Landfill Gas Power Generation Projects
The landfill gas project of Beijing Liulitun landfill sites was completely acquired from Dongzhao Changtai Group in July 2014 and its installed capacity is 4000KW, it is expected to be connected to the grid for power generation in May 2015.

Harbin BCCY

Landfill Gas Power Generation Projects
The landfill gas project of Harbin landfill sites, with 4000KW installed capacity, is expected to be connected to the grid for power generation in July 2015.

Zunyi Xinneng

Landfill Gas Power Generation Projects
The landfill gas project of Zunyi landfill sites was completely acquired from Shenzhen Xinneng Environmental Protection Technology Co., Ltd. in September 2014 and its installed capacity is 2000KW, it is expected to be connected to the grid for power generation in May 2015.

Huaihua Xinneng

Landfill Gas Power Generation Projects
The landfill gas project of Huaihua landfill sites was completely acquired from Shenzhen Xinneng Environmental Protection Technology Co., Ltd. in September 2014 and its installed capacity is 3000KW, it is expected to be connected to the grid for power generation in May 2015.

Rongchang BCCY

Landfill Gas Power Generation Projects
The landfill gas project of Rongchang waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in May 2015.

Shaoguan BCCY

Landfill Gas Power Generation Projects
The landfill gas project of Shaoguan municipal waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in April 2015.

Jingmen BCCY

Landfill Gas Power Generation Projects
The landfill gas project of Jingmen waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in January 2015.

Huixian BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Huixian waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in January 2011.

Shenqiu BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Shenqiu waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in December 2014.

Xiangcheng BCCY

Landfill Gas Power Generation Projects
The landfill gas power generation project of Xiangcheng waste landfill sites, with installed capacity of two 500KW generator units, was successfully connected to the grid for power generation in November 2011.

Zhenping BCCY

Landfill Gas Power Generation Projects
The landfill gas project of Zhenping waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in March 2015.

Ruzhou BCCY

Landfill Gas Power Generation Projects
The landfill gas project of Ruzhou waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in March 2015.

Suzhou Youneng

Landfill Gas Power Generation Projects
Suzhou waste landfill gas power generation project was completely acquired from British Sindicatum company in May 2014 and its installed capacity is 2000KW.

Feixi BCCY

Landfill Gas Power Generation Projects
The landfill gas project of Feixi waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in March 2015.

Ningguo BCCY

Landfill Gas Power Generation Projects
The landfill gas project of Ningguo waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in April 2015.

Maanshan BCCY

Landfill Gas Power Generation Projects
The landfill gas project of Maanshan waste landfill sites, with 4*500kw installed capacity, is expected to be connected to the grid for power generation in July 2015.

GuangDe BCCY

GuangDe BCCY
Anhui GuangDe landfill landfill gas power generation project installed capacity of 1000 kw, has successfully connected to the grid in 2016.

Zhongxiang BCCY

Zhongxiang BCCY
Hubei zhongxiang landfill gas power generation project, grid power generation in December 2017, installed 1 mw.

Puyang BCCY

Puyang BCCY
Puyang landfill gas power generation projects signed in March 2016, in January 2017 formally connected to the grid, the installed capacity of 2000 kw.
close

Jinhua BCCY

Jinhua BCCY
Jinhua city, zhejiang province landfill gas power generation project, signed in January 2017, connected to the grid in 2017, a period of 2 megawatts of installed.
close

Linfen BCCY

Linfen BCCY
Shanxi linfen municipal landfill gas power generation project, our company is in the first project of the jin, the first phase installed capacity 1000KW, in January 2018 successfully connected to the grid power generation.
close

Heze BCCY

Heze BCCY
Shandong heze municipal landfill gas power generation project, signed in July 2017, connected to the grid in 2018 and installed 2 mw in the first phase.
close

Dashiqiao BCCY

Dashiqiao BCCY
In liaoning province, the landfill power generation project was signed in April 2017. Currently, the first phase of the project is planned to be 1 mw.
close

Chaoyang BCCY

Chaoyang BCCY
Liaoning chaoyang municipal landfill power generation project, signed in July 2017, currently under construction, the first phase of the planned installation of 2 mw.
close

Xiaogan BCCY

Xiaogan BCCY
Hubei xiaogan landfill gas power generation project, signed in December 2017, is under construction.
close

Tanghe BCCY

Tanghe BCCY
The waste landfill gas power project in tanghe city, henan province was successfully connected to the grid in December 2017.
close

Dengzhou BCCY

Dengzhou BCCY
The landfill gas generation project in dengzhou city, henan province, signed in July 2017, is currently under construction and plans to be connected in the first half of 2018.
close

Shangcai BCCY

Shangcai BCCY
Henan zhumadian shangcai landfill gas generation project, signed in November 2017, planned to connect the grid in July 2018.
close

Nanhe BCCY

Nanhe BCCY
Hebei province south and city landfill gas generation project, signed in November 2017, currently under construction, plans to connect in the first half of 2018.
close

Baise BCCY

Baise BCCY
Guangxi province baise landfill gas power generation project, signed in April 2017, currently under construction, the first phase of the planned installation of 1 megawatt, planned to be connected to the grid in July 2018.
close

Qingyang BCCY

Qingyang BCCY
In qingyang city, gansu province, the landfill gas power generation project, with 1 mw installed in the first phase, was successfully connected to the grid in October 2017
close

Mengcheng BCCY

Mengcheng BCCY
In the city of mengcheng, anhui province, the landfill gas power generation project, signed in November 2017, is currently under construction and is scheduled to be connected in July 2018
close